
Oil Delivery

Repair Services

Cleaning &Maintenance

Protection
Plans
Our Services:
- Heating Oil Deliveries for Residential and Commercial Properties
- Automatic Deliveries
- COD Deliveries
- Bulk Delivery Discounts
- Budget Lock-In Plans
- Pre-buy plans
- RI Fuel Assistance Vendor
- Full Service Department
- Service and Repairs on Oil and Gas Heating Systems
- Installation of Oil and Gas Heating Systems
- Option of 2 (Two) 24 Hour Service Contracts for Oil Heating Systems
- Contracts for Domestic Hot Water Heaters
- Installation, Service, and Repairs of Air Conditioning systems
Protection Plans:
Standard Burner Protection Plan
(Includes an Annual Cleaning)
The following is a list of parts protected under this agreement that will be repaired or replaced without additional costs:
- 24 Hour Service
- Boiler Glass Gauge & Washers
- CAD Cell Eye
- CAD Cell Relay
- Coupler (Burner)
- Draft Regulator
- Electrodes
- Ignitor/Tranformer
- Ignition Leads
- Nozzle
- Oil Burner Fan
- Oil Burner Motor
- Oil Burner Pump
- Oil Burner Switch
- Oil Firomatic Valves
- Oil Line Fittings
Complete Protection System
(Includes an Annual Cleaning)
- 24 Hour Service
- Aquastat (Single & Dual Action)
- Back Flow Preventer
- Blast Tube
- Boiler Drain
- Burner Fan
- Burner Motor
- CAD Cell
- Circulator
- Combustion Control Relay
- Coupler (Burner)
- Draft Regulator
- Dual Relief & Reducing Valve
- End Cone
- Electrodes
- Expansion/Extrol Tank
- Flange
- Flow Check
- Fuel Pump
- Furner Blower Fan
- Hot Water Vent
- Ignitor/Transformer
- Nozzle & Assembly
- Oil Filter Cartridge
- Oil Firomatic Valve
- Pressure Control
- Reducing Valve
- Relief Valve
- Stack/CAD Cell Relay
- Tank Gauge
- Thermostat (T-87 Only)
- Zone Valves/Power Heads (Taco)
Domestic Hot Water Protection
(Includes an Annual Cleaning)
- Aquastat
- Burner Parts
- Ball Valves
- Globe Valves
- CAD Cell
- Circulator Assembly
- Circulator Complete
- Circulator Motor
- Circulator Relay
- Draw Off Valve(s)
- Electrical Switches
- Flow Check
- Mixing Valve
- Primary Relief Value
Fuel Tank Leak Protection
(A Burner Protection Plan is required in addition to purchasing this plan and an initial tank inspection is also required)
*Customer must have an above residential inside oil storage tank
- Alarm
- Filter
- Gauge
- Legs
- Oil Valve
- Removal of Existing Tank
- Tank Failure
- Vent
*Does not include oil line, environmental or oil clean-up due to failure*
Areas of Service:
Rhode Island:
Barrington
Burrillville
Central Falls
Coventry
Cranston
Cumberland
East Greenwhich
East Providence
Foster
Glocester
Johnston
Lincoln
North Kingston
North Providence
North Smithfield
Pawtucket
Providence
Scituate
Smithfield
Warwick
West Warwick
Woonsocket
Massachusetts:
Attleboro (North and South)
Bellingham
Blackstone
Rehoboth
Seekonk